API 1104 Piping Project


Challenge

A large utility and piping station in Michigan turned to W. Soule to fabricate custom piping for their facility. Usually projects like this would have been fabricated in the field leaving the project open to the variables of Mother Nature. However the scale and equipment in our indoor fabrication space made W. Soule a perfect fit.

Solution

The piping was fabricated at Soule Fabrication Group - our largest facility.

  • All supplies were warehoused indoors, keeping them clean, dry and at a constant temperature.
  • The air is a predictable 55-60 degrees which helps standardize weld procedures.
  • Multiple positioners made it possible to roll the majority of welds.

These factors all help simplify the project, remove variables and speed it along which help to lower costs.
W. Soule is quality work done on time and on budget.